Dryliners · Matched to your postcode · No contract
Council and government work
Councils buy drylining the way they buy anything else: against a specification, on a purchase order, from a supplier who can prove the paperwork. The work itself is often small - a single property, a callout, a job that has to be done before a deadline - but the process around it is formal, and it is the process that stops most small firms bidding.
We are happy to discuss taking on contracts from any local authority in the UK, and to bring in accredited drylining firms to deliver them.
What Southend-on-Sea actually buys
The work that comes out of a district like this is rarely glamorous and rarely large. It is the drylining that keeps buildings usable:
drylining and partitioning on void refurbishments
suspended ceilings in civic offices and community buildings
acoustic upgrades to schools and libraries
fire-rated partitions and fire stopping on housing stock
plasterboard repairs after leaks and water damage
tape and joint finishing on new-build council housing
How the council appoints a supplier
Below the council's own threshold the buyer usually needs three written quotes rather than a full tender, and that is the route most small drylining jobs take. Above it, the work is either tendered openly or called off an existing framework - often a national one such as Crown Commercial Service, or a regional buying consortium - where the supplier has already been vetted and the council can buy without running a competition. Both routes end the same way: a purchase order, a start date and an invoice that has to match the order line for line.
What we can take on
We are not the council and we are not a main contractor, so we do not pretend to award anything. What we do is run the pages you are reading, match enquiries to drylining firms in the right area, and put suppliers in front of the people who need the work. Where a council or a main contractor wants a package delivered, we can discuss taking it on and bringing in accredited firms to deliver it, with the arrangement set out in writing before any work starts.
The paperwork a council will ask for
Public liability insurance at the level the council's contract terms require, with the council named as an interested party where it asks for that.
Employers' liability insurance if anyone works on the job, and evidence that subcontractors carry their own cover.
The trade accreditations the work legally needs, current and in the firm's own name rather than a partner's.
A written method statement and risk assessment for the site, and a waste transfer note for anything taken away.
Confirmation of tax status so the council can satisfy its own checks before it raises a purchase order.
What we hold
£5 million public liability cover and £10 million employers' liability cover, with certificates available on request.
A named contract manager and a 24-hour number for out-of-hours work.
Method statements, risk assessments and COSHH sheets supplied before the first job on site.
Every subcontractor we use carries its own insurance and CSCS card, checked before they start.
Waste carrier registration and transfer notes for anything removed from site.
Fire-stopping records and photographs supplied for building control on completion.
How to start
If you are buying for Southend-on-Sea and want to discuss a package, call 07392 065105 or email [email protected]. If you are a drylining firm that wants the enquiries, apply through the site and we will check your insurance and accreditation before your details go anywhere near a customer.
Do councils only use large contractors?
No. A council can only buy from suppliers it has checked, but plenty of that work is small enough to sit below the threshold where a full tender is needed, and framework sub-lots exist for exactly that. What rules small firms out is missing insurance or a missing certificate, not size.
How do I get on a council's supplier list?
Register on the council's procurement portal and on the national find-a-tender service, keep the insurance and accreditation documents current, and answer the quote requests that come through. Being on the list is the easy part; answering quickly is what wins the work.
Do you take a cut of council work?
No. If we introduce work we agree the arrangement in writing before anything starts, and the council or main contractor pays the supplier directly.